Summary

 

The Project plan provides carrying out of pilot expedition in the fourth quarter. It’s primary goal are specification of points of the control, carrying out of timing, approbation of the got portable equipment in real conditions, carrying out of measurement of some parameters of quality of waters, sampling of water for laboratory analyses, etc.

According to it in 18 – 21on October, under the established scheme in a river basin of the Kura, pilot expedition with participation of the Tbilisi state university and the State department of hydrometeorology has been carried out.

During pilot expedition the following works have been executed:

·        calibration of portable equipment Horiba U-10 is carried out;

·        reconnaissance of points of the control is executed, ways of the approach and distances between them are determined;

·        the first measurements according to developed SOP with the use of portable equipment Horiba U-10, Vertical point water sampler and Horizontal point water sampler are carried out; and also a number of parameters of quality of water is determined;

·        sampling for laboratory analyses by definition of concentration of metals and ions is carried out;

·        questions and problems are determined and corresponding recommendations are prepared.

Results of pilot expedition are made out in scientific and technical report.

 

 


Departure for the route

 

 

The specially equipped automobile

 

 Discussion of the plan

      

 

 

 Western route

 

1.   R. Kura, v. Khertvisi (Site #1)

 

2.   R. Kura, c. Borjomi (Site # 3)

3. R. Kura, c. Khashuri (Site # 5)

 

 

The first sampling      

 (Horizontal point water sampler)

 

Preparation of water sampling from the bridge  (Vertical point water sampler)

 

       Preparation for measurements from the bridge

 

4. R. Kura, c. Gori (Site # 7)   

 

 

5.  R. Lekhura, c. Kaspi (Site # 9)

 

Control point

 

 Sampling by the bucket

 

 

 

 Eastern route

 

 6.  R. Kura, ZAGES-Avchala (Tbilisi) (Site # 11)

 

 

The control of parameters over the bridge  

(water quality checker Horiba U-10)

 

 

 The control of parameters over the river

(water quality checker Horiba U-10)

 

 

 

7.  R. Kura, Vakhushti Bagrationi Bridge (Tbilisi) (Site # 12)

 

 

 

Preparation for the control of parameters from the bridge

(water quality checker Horiba U-10)

 

  Process of the parameters control from the bridge

(water quality checker Horiba U-10)

 

 

 

8.  R. Kura, v. Gachiani (Tbilisi) (Site # 13)

 

 

 

 

9.  R. Kura, c. Rustavi (Site # 15)

  Sampling by the bucket

The control of parameters over water

(water quality checker Horiba U-10)

 

 

 

 

10.   R. Khrami, Red Bridge (Site # 16)

 

 The working moment

The control of parameters over water

(water quality checker Horiba U-10)

 

 

 

              

Back